
Repair and levelling of subfloor, and replacement of floor covering in accommodation, corridors and technical areas.
Request a Quote →A floor with a compromised subfloor is not fixed by replacing the covering alone — the infiltration or unevenness reappears within months. Finding that out late, with the new covering already installed, means redoing the whole job.
We assess the subfloor before specifying the covering. When there is unevenness, infiltration or structural damage, we fix the cause first — and only then install the final flooring, with confidence it will last the expected cycle.
An on-site technical assessment identifies this before we quote — we do not recommend replacing covering over a compromised subfloor.
It depends on the extent of the repair. We plan execution in sections when the area cannot be fully closed off.
It varies with extent and drying time between stages. We state the real timeline in the RFQ reply, not a generic estimate.
Send us your requirement and our team will review the scope and get back to you. Partial information is fine — we will come back with the questions that matter.
Prefer e-mail? Send the RFQ directly to comercial@gulfmarineadvisors.com
Need a fast response for an offshore vessel? Write to us before the window closes.